Pubali Construction Company Limited.
webmail

COMPLETED PROJECTS


Building Works

Construction of Raw Materials (RM) Building.

Employer: M/s. Kwun Tong Apparels Ltd., Plot No. 59-87, Adamjee EPZ, Adamjee, Narayangonj.
Date of Commencement of work: January 2013,
Schedule Completion: November 2013
Nature of Works

Site Preparation, Earth work in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, Brick Flat Soling, Lean Concrete (75mm thick.), RCC work in foundation, column, beam, and roof slab etc., Shuttering work for RCC work, Reinforcement works for Above RCC work, Brick work (125mm,250mm), Plaster work, Floor Finishing, Painting Works with Electrical, Fire Fighting & additional works (i.e. Sheet Piling for Protection works).

Value of Contract: BDT. 4.75 Crore I US$ 0.6 Million


Construction of 4xFactory Building (3rd Phase) for Karnaphuli Shoe Industries (1(51) at KEPZ, Chittagong.

Employer: Karnaphuli Shoe Industries (KSI) House # 14, Road # 7c, Uttara, Dhaka, Bangladesh.
Date of Commencement of work: May 2012
Schedule Completion: June 2013
Nature of Works

Site Preparation, Earth work in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, Brick Flat Soling, Lean Concrete (75mm thick.), RCC work in foundation, column, beam, and slab etc., Shuttering work for RCC work, Reinforcement bar works for Above RCC work, Brick work (250mm), Plaster work, Floor Finishing, Painting Works.

Value of Contract: BDT. 33.64 Crore I US$ 4.21 Million

Construction of 120 TPD Coconut Oil Plant Factory at Bagerbazar, Gazipur Sadar, Gazipur.

Employer: Marico Bangladesh Ltd. House # 01, Road # 01, Sector # 01, Uttara, Dhaka.
Tel: +88-02-8931202 (Hunting),
Fax: +88-02-8932322
Start Date: August 2011
Completion Date: March 2013
Nature of Work

- PPE, Safety, Health & Environment
- Excavation of foundation, dewatering, sand filling, back filling,.
- Construction of Oil Mill, copra silo, copra building, oil tank-cake silo, loading bay, cake bagging.
- RCC casting rebar work, brick work, plastering, painting, grouting, M.S. bolt fixing, Tiles, False Ceiling, Thai Aluminium work, laouver, Door, window, septic tank, sanitary, plumbing, re-plantation, landscaping etc.
-Construction & Development of Deep Tube well.

Total Contract Price: BDT - 11.10 Crore I US$ - 1.58 Million

Construction of Effluent Treatment Plant (ETP) at Shed-2, AEPZ, Adamjeenagar, Narayangonj.

Employer: Kwun Tong Apparels Ltd. Shed No. l& 2, Plot # 59-87, AEPZ, Adamjeenagar, Narayangonj, Bangladesh.
Tel: +88-02-7691791,
Fax: +88-02-7608298
Date of Commencement of Work: July 2012
Date of Completion: October 2012
Nature of Work

- Earth Work in Excavation - 1789.86 cum.
-Disposal of Earth Work - 1789.86 cum.
-Backfilling of Earth - 574.16 cum.
-Sand Filling under Footing - 503.48 cum.
- 75mm thick cement concrete (1:3:6) - 32.26 cum.
-One layer of brick flat soling - 403.07 sqm.
-Fabrication & fixing (60 grade deformed bar) - 29.50 M.T.
-25mm thick patent stone finishing - 66.17 sqm. Reinforced Cement Concrete Works (1:1.5:3)
- RCC footing - 159.97 cum. -RCC for Pedestal Column/Wall/Slab- 126.18 cum.

Value of Contract: BDT - 00.45 Crore I US$ - 00.05 Million

Construction of Youngone Aircraft Hanger, Apron & Taxi way Project (Civil Works) at Shahjalal International Airport, Dhaka.

Employer: Youngone (CEPZ) Ltd. House # 42, Road # Lake Drive Road, Sector-7, Uttara, Dhaka-1230.
Tel: +88-02-8913609, 8953859,
Fax: +88-02-8913609
E-mail: flightops@youngone.co.kr
Date of Commencement of work: July 2010. Schedule Completion: Oct. 2012
Nature of Work

Site Preparation -
Earth work in Excavation- 2, 425.00 cum. Earth filling by Excavated Soil: 1,795.00 cum. Sand filling by carried sand - 1,167.00 cum. One Layer Flat Break Soling - 3,645.00 sqm. Lean Concrete 75mm thick. - 30.5 cum. RCC work in foundation, column, beam, and slab etc.- 782.00 cum. Shuttering work for RCC work- 1,299.7 sqm. Reinforcement bar works for Above RCC work: 59.25 M. Ton. Machine made Brick work (250.00 mm)- 119.2 cum. Plaster work- 1,195.52 sqm.
Floor Finishing by Tiles - 844.2 sqm. Painting Work - 1,195.52 sqm

Value of Contract:BDT - 5.00 Crore I US$ - 0.70 Million

Construction of Proposed Extension of 06 (six) Storied Office Building for Youngone Hi-Tech Sportswear Ind. Ltd. at DEPZ, Savar, Dhaka.

Employer: Youngone (BD) Ltd., Plot # 1-4, 9-12, DEPZ, Savar, Dhaka.
PABX: i 88-02-7701025,
Fax: +88-02-7701023 & 770103, E-mail: yht@youngone.co.kr
Start Date: Feb 2011,
Completion Date: Feb. 2012
Nature of Works

Site Preparation- Earth work in Excavation: 966.00 cum.
Earth filling by Excavated Soil: 483.00 cum.
Sand filling by carried sand: 601.00 cum.
Lean Concrete 75mm thick: 34.88 cum.
RCC work in foundation, column, beam, and slab etc.: 927.00 cum.
Shuttering work for RCC work: 4,771.00 sqm.
Reinforcement bar works for Above RCC work: 147.00 M. Ton. Machine made Brick work (250mm): 144.99cum.
Plaster work: 4,628.00 sqm.
Floor Finishing: 2,457.00 sqm.
Painting (Internal & External painting work): 6,089.00 sqm.



Total Contract Price:BDT- 2.62 Crore I US$- 0.32 Million

Construction of YCL-Medical Extension Building at CEPZ, Chittagong.

Employer: Youngone (CEPZ) Ltd. Plot # 11-16, Sector # 2, Chittagong Export Processing Zone, Chittagong, Bangladesh.
Tel: +31-740431-6, 740043
Fax: +31-740044, 740015,
E-mail: flightops@youngone.co.kr
Start Date: June 2011,
Completion Date: February 2012
Nature of Works

Site Preparation: 1,020.00 sqm.
Earth work in Excavation: 1,593.00 cum.
Earth filling by Excavated Soil: 1,275.88 cum.
Sand filling by carried sand: 648.00 cum.
Lean Concrete 75mm thick: 59.74 cum.
RCC work in foundation, column, beam, and slab etc.: 452.91 cum. Shuttering work for RCC work: 845.47 sqm.
Reinforcement bar works for Above RCC work: 67.02 M. Ton. Machine made Brick work (250mm): 22.28cum.
Plaster work: 1,275.84 sqm.
Floor Finishing: 2,880.00 sqm.
Painting (Internal & External painting work): 8,147.00 sqm.



Total Contract Price: BDT - 4.85 Crore I US$ - 0.68 Million

Construction of Canteen/Workshop for KSI at KEPZ, Chittagong.

Employer: Karnaphuli Shoes Industries (KIS) Ltd. House # 14, Road # 7c, Uttara, Dhaka.
Start Date: January 2012,
Completion Date: April 2012
Nature of Works

Site Preparation- Earth work in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, Lean Concrete, RCC work in foundation, column, beam, and slab etc. Shuttering work for RCC work, Reinforcement bar works for Above RCC work, Machine made Brick work (250mm), Plaster work, Floor Finishing, Painting (Internal & External painting work).



Total Contract Price: BDT- 1.34 Crore I US$- 0.17 Million

Construction of 2x ware House for KSI at KEPZ, Chittagong of Karnaphuli Shoes Industries Ltd.

Employer: Karnaphuli Shoes Industries (KIS) Ltd. House # 14, Road # 7c, Uttara, Dhaka.
Start Date: April 2011,
Completion Date: January 2012
Nature of Works

Site Preparation: 16,128.00 sqm.
Earth work in Excavation: 3,306.00 cum.
Earth filling by Excavated Soil: 3,306.00 cum. Sand filling by carried sand: 6,048.00 cum. Brick Beds layer: 2,419.00 cum.
Lean Concrete 75mm thick: 203.76 cum.
RCC work in foundation, column, beam, and slab etc: 3678.57 cum.
Shuttering work for RCC work: 2,476.00 sqm.
Reinforcement bar works for Above RCC work: 153.67 M. Ton.
Brick work (250mm): 378.78 cum.
Plaster work: 3,745.00 sqm.
Floor Finishing: 16,128.00 sqm.



Total Contract Price: BDT - 3.55 Crore I US$ - 0.50 Million

Construction of Coal Boiler Room for KSI at KEPZ of Karnaphuli Shoes Industries Ltd.

Employer: Karnaphuli Shoes Industries (KIS) Ltd. House # 14, Road # 7c, Uttara, Dhaka
Start Date: December 2011,
Completion Date: March 2012
Nature of Works

Site Preparation. Earth work Excavation: 432.00 cum.
Earth filling: 302.00 cum. Lean Concrete: 86.00 cum. RCC work: 637.00 cum.
Brick work (250mm): 63.00 cum. Painting works: 508.00 sqm. Plaster works: 508.00 sqm.
Floor Finishing works: 1,108.00 sqm.
Shuttering works: 1,098.28 sqm. Re-bar works: 24.66 Tones.



Total Contract Price: BDT - 0.65 Crore I US$ - 0.08 Million

Execution of In situ test piles, additional piles, deep tube well under MTHojgaard in connection with Saidabad Water Treatment Plant Phase-II, Dhaka WASA, Dhaka.

Employer: Dhaka WASA, Dhaka.
Start Date: 01-11-2011
Completion Date: June 2011
Nature of Works

Work permit, Health, Safety & Environment, Boring & casting of In situ Piles (dia 600 &750 mm, L= 22m- 25m, 70 nos ), Boring, supply, installation, development & commissioning of 8" dia deep tube well with 3"dia delivery submersible pump - 1 set.



Total Contract Price: BDT - 2.10 Crore I US$ - 0.28 Million

Construction of YSS Extension Project.

Employer: Youngone (CEPZ) Ltd. Plot # 11-16, Sector # 2, Chittagong Export Processing Zone, Chittagong, Bangladesh.
Tel: +31-740431-6, 740043
Fax: +31-740044, 740015,
E-mail: techdiv@youngone.co.kr
Start Date: May 2009
Completion Date: Sept. 2009
Nature of Works

Site Preparation: 3,024.00 sqm.
Earth work in Excavation: 441.00 cum.
Earth filling by Excavated Soil: 143.00 cum.
Sand filling by carried sand: 2,719.00 cum.
Bricks Flat Soling: 2,970.00 Sqm.
Lean Concrete (75mm thick.) : 40.58 cum.
RCC work in foundation, column, beam, and slab etc.: 545.7 cum. Reinforcement bar works for Above RCC work: 12.00 M. Ton. Brick work (250mm): 110.00 cum.
Plaster work: 210.00 sqm.
Floor Finishing : 2,758.00 sqm.
Painting works: 924.00 sqm.



Total Contract Price: BDT - .97 Crore I US$ - 0.13 Million

Construction of YSS-5 New Canteen Building, LEG Water Tank, Internal Road & Land Development at Plot # 1 & 2, Sector-2A.

Employer: Youngone (CEPZ) Ltd. Plot # 11-16, Sector # 2, Chittagong Export Processing Zone, Chittagong, Bangladesh.
Tel: +31-740431-6, 740043
Fax: +31-740044, 740015,
E-mail: techdiv@youngone.co.kr
Start Date: October 2010
Completion Date: January 2011
Nature of Works

Earth work in Excavation: 1,595.00 cum.
Earth filling by Excavated Soil: 815.00 cum.
Sand filling by carried sand: 1,071.00 cum. Brick Flat Soling: 940.00 cum.
Plain Concrete (75mm thick.): 75.5 cum.
RCC work in foundation, column, beam, and slab etc.: 736.47.00 cum. Shuttering work for RCC work: 635.00 sqm.
Reinforcement bar works for Above RCC work: 80.19 M. Ton.
Brick work (250mm): 182.50 CUM.
Plaster work: 2636.00 sqm.
Floor Finishing : 1,298.00 sqm.
Painting Works: 2,636.00 Sqm.



Total Contract Price: BDT -1.21 Crore I US$ - 0.15 Million

Construction of Factory Building and Effluent Treatment Plant ( ETP ) of capacity 300 m3/hr (Phase-II), Adamjee EPZ, Narayangonj.

Employer: Kwun Tong Apparels Ltd. Shed No. l& 2, Plot # 59-87, AEPZ, Adamjeenagar, Narayangonj, Bangladesh.
Tel: +88-02-7691791
Fax: +88-02-7608298
Start Date: 10.09.2008
Completion Date: 10.03.2010
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 10.08 Crore I US$ - 1.44 Million

Pump House Station at Kallyanpur under Obyashi Corporation, Japan.

Start Date: 25.10.2007
Completion Date: 31.03.2009
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 2.50 Crore I US$ - 0.36 Million

Construction of Factory Building (Phase-I), Adamjee EPZ, Narayangonj.

Employer: Kwun Tong Apparels Ltd. Shed No. l& 2, Plot # 59-87, AEPZ, Adamjeenagar, Narayangonj, Bangladesh.
Tel: +88-02-7691791,
Fax: +88-02-7608298
Start Date: 01.08.2006
Completion Date: 28.02.2007
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 8.90 Crore I US$ - 1.25 Million

Construction of 600 Seated Modern Auditorium Building at BRDTI, Khadimnagar, Sylhet.

Employer: Bangladesh Rural Development Board (BRDB), 5 Kawran Bazar C/A, Dhaka.
Start Date: May 2005
Completion Date: 30.08.2006
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 3.82 Crore US$ - 0.57 Million

Construction of Cyclone Shelter.

Employer: Shimizu Corporation, Japan.
Start Date: Aug. 2004
Completion Date: June 2006
Nature of Works

Earth work, rebar, R.C.0 casting, form work, brick work, plastering, sanitary, plumbing, deep tube well, plumbing, wood work, steel work, white washing, painting etc.



Total Contract Price: BDT - 2.30 Crore US$ - 0.34 Million

Construction of 07 (Seven) Storied Staff Dormitory Building at Chittagong.

Employer: Youngone (BD) Ltd. Chittagong, Bangladesh.
Start Date: Dec. 2002
Completion Date: August, 2004
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 10.21 crore I US$ -1.86 Million

Construction of 4-Storied Youngone Hi-Tech Sports Wear Annex Complex Building at DEPZ, Savar, Dhaka.

Total Constructed Building Area: 4,500 sqm.
Employer: Youngone Hi-Tech Sports Ind. Ltd., DEPZ, Savar, Dhaka.
Start Date: October 2001
Completion Date: May 2003
Nature of Works

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.0 casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.



Total Contract Price: BDT - 4.20 Crore US$ - 0.76 Million

Construction of Dyeing, Spinning Factory Building including 4 (four) storied Administrative Building & Dormitory House at Plot No.224-260 and 94-101, Dhaka Export Processing Zone (Extension), Savar, Dhaka.

Employer: Ring Shine Textile Ltd. Plot # 224-260, Extension Area DEPZ, Ganakbari, Savar, Dhaka, Bangladesh.
Tel: +88-02-7701388
Start Date: Aug. 1998
Completion Date: January. 2003
Nature of Works

Dyeing Factory Building, Sweater Building, Spinning Building, Ware House, Canteen, Overhead Water Tank, and underground Water Reservoir, 4 Noose. Boundary Fence, RCC & bituminous road etc., Polar dyeing factory, Cone dyeing factory, Yarn Processing factory, Ware House, Dormitory and Others, Effluent Treatment Plant-Capacity 100m3/hr. a) Equalization Tank - Size: 35mx25mx4mD, b) Aeration Tank- Size: 50mx25mx5mD, c) Clarifier Tank- Size: Dia 15m., d) Sludge Tank - Size: 20mx10mx2.5mD



Total Contract Price: BDT - 35.77 Crore I US$ - 6. 16 Million

Construction of Factory Building and other ancillary work at Plot No. 133 to 148), DEPZ (Extension), Savar, Dhaka.

Employer: Kung Keng Textile (Bangladesh) Co. Ltd. DEPZ (Extension), Plot # 135-146, Savar, Dhaka, Bangladesh.
Tel: +88-02-7701142-44,
Fax: +88-02-7701145
E-mail: kktb@bol-online.com
Start Date: January 2001
Completion Date: June 2003
Nature of Works

(i)Factory Building Area (Dyeing and Spinning Factory Building- 21,675 Sqm.), Concrete work, brick work, underground RCC Duct and erection of Pre-Feb Steel Structure &
(ii)Construction of underground water Reservoir, Waste water treatment plant, three storied office building, Generator house, RCC Road, Boundary fence etc.



Total Contract Price: BDT -14.25 Crore I US$ - 1.83 Million

Construction of 2 (two) nos. 10,000 gallons Oil Tank for 120 TPD Coconut Oil Plant Factory at Bagerbazar, Gazipur Sadar, Gazipur.

Employer: Marico Bangladesh Ltd. House # 01, Road # 01, Sector # 01, Uttara, Dhaka.
Date of Commencement of work: April 2013
Schedule Completion: July 2013
Nature of Works

-PPE, Safety, Health & Environment
-Excavation of foundation, CC, RCC works for base & wall, sand fillings for foundation works, loading bay & dyke wall etc.

Value of Contract: BDT. .70 crore I US$ 0.089 Million

Construction of YCL-8 (Six Storied Building) at Sector-2, CEPZ.

Employer: Youngone (CEPZ) Ltd., Plot # 11-16, Sector # 2, CEPZ, Chittagong, Bangladesh.
Phone: 31-740431-6, Fax: 31-740044,
E-mail: techdiv@youngonectg.com
Date of Commencement of work: Nov 2011,
Schedule Completion: Dec. 2013
Nature of Works

Site Preparation - 2,460.00 sqm.
Earth work in Excavation- 3,672.00 cum.
Earth filling by Excavated Soil: 2,203.00 cum.
Sand filling by carried sand - 5,766.00 cum.
Brick Flat Soling - 1,750.00 cum.
Lean Concrete (75mm thick.) - 144.00 cum.
RCC work in foundation, column, beam, and slab etc.- 6,360.00 cum.
Shuttering work for RCC work- 24,313.00 sqm.
Reinforcement bar works for Above RCC work: 696.85 M. Ton.
Brick work (250mm)- 1,032.00 cum. Plaster work- 20,515.00 sqm.
Floor Finishing -11,948.00 sqm. Painting Works- 30,546.00 Sqm.

Value of Contract: BDT -18.71 Crore I US$ - 2.29 Million

Construction of Fael-Khair School-cum-Cyclone Shelters, Contract No. BD1-0014 (Package-2).

Employer: WSP International Management Consulting FAEL KHAIR SCHOOL-cum-SHELTERS PROGRAM, House No. 09, Road No. 11, Baridhara, Dhaka-1212.
Tel: +88-02-8825761, 8811075,
Fax: +88-02-8823713 Email: pmc@wspdhaka.com
Date of Commencement of work: July 2011
Schedule Completion: Dec. 2013
Nature of Works

-PPE, Safety, Health & Environemnt.
- Foundation Excavation, bailing out water, sand filling, backfilling, site development. - Construction of 33 Nos. (2- storied) School cum Cyclone Shelter with raft foundation, in situ pile, precast pile, combined footing foundation.
- Pile static load test, integrity test.
- Testing of water used, material test, trial mix design for concrete work.
- RCC casting, rebar work, steel form work, scaffolding, brick work, plastering, painting, patent stone, screeding, sanitary, plumbing, concealed electrification, septic tank, tube well boring & development, Door, window, surface drain, anti-termite, black board, signboard, protective work, Tile works etc.

Value of Contract: BDT - 130.99 Crore I US$ - 15.97 Million

Road Works

Periodic Maintenance Program 2009-2010 (1st Tranche): Contract Package No.: PMP 2009-010/07/Overlay works (Tranche-1) under Planning & Maintenance Wing, Roads & Highways Department.

Employer: Additional Chief Engineer, RHD, Planning & Maintenance Wing Sarak Bhaban, Ramna, Dhaka.
Tel: +88-02-9562821,
E-mail: acepmz@rhd.gov.bd
Start Date: April 2010,
Completion Date: December 2012.
Nature of Work

Earth Shoulder: 610.20 m3
Hard Shoulder: 2,025.0m3
Aggregate Base Type-I : 6961.95 m3
Bituminous Prime Coat: 45,079.95 sqm.
Bituminous Tack Coat: 1,61,874.96 sqm.
DBS Wearing Course: 10,056.74cum.
Road Marking: 1,361.50 sqm.
Saucer Drain : 2,600 L.meter
Side Ditch/U Drain with Cover slab: 2,600 meter

Total Contract Price: BDT - 15.09 Crore I US$ - 2.16 Million.

Development/Preparation of Construction Yard for Padma Multipurpose Bridge project at Mawa (North), Munshigonj during the year 2010-2011.

Employer: Project Director, Bangladesh Bridge Authority, Padma Multipurpose Bridge, Shetu Bhaban, Banani, Dhaka.
Start Date: January 2011
Completion Date: Dec. 2012
Nature of Works

Excavation for GEO bags Slope Protection & Apron etc.: 1,60,000.00 cum. Supply & Place of 250 kgs GEO bags for Slope Protection: 1,25,000.00 Nos. Supply & Place of 125 kgs GEO bags for Apron : 1,55,000.00 Nos. Earth Filling by carried Earth/Sand: 15,00,000.00 cum.

Total Contract Price: BDT - 28.00 Crore I US$ - 4.00 Million

Contract Package No.: PMP 2007-08/23/Overlay & DBST works (Tranche-3) under RHD, Dist.- Bogra.

Employer: Employers Representative, PMP 2007-2008 & Additional Chief Engineer, RHD, Planning & Maintenance Wing, Sarak Bhaban, Ramna, Dhaka.
Start Date: 18. 06. 2008.
Completion Date: December 2010
Nature of Works

Earth Shoulder: 2,307.6 m3
Hard Shoulder: 2,934.4m3
Premix Bituminous Carpeting: 920.15 m3
Tack Coat: 21,879.00 sqm.
DBST Work: 1,73,491.800 sqm.
DBS Wearing Course: 2,135.25 m3
Road Marking: 7,737.14 sqm.



Total Contract Price:BDT - 6.94 Crore I US$ - 0.99 Million

01-PRC/2005-2006 (Construction of 185.99 M. long pre-stressed girder R.C.C. bridge in place of Pangashi Bailey Bridge at 9th K.M. of Sirajgonj-Raygonj Road under Road Division Sirajgonj during the year 2005-2006)

Employer: Executive Engineer, RHD (C.C), Road Division, Sirajgonj.
Start Date: 1 January, 2006.
Completion Date: 30 June, 2010
Nature of Works

Earth work, execution of In situ piles, Pile Load test, rebar, R.C.0 casting, pre¬stressing girder, staging, form work, expansion joint, pier, abutment, deck slab, approach road, protective works etc.



Total Contract Price:BDT - 3.69 Crore | US$ - 0.59 Million

Contract Package No.: PMP 2007-08/19/Overlay works (Tranche-3) under RHD, Rajbari.

Employer: Employers Representative, PMP 2007-2008 & Additional Chief Engineer, RHD, Planning & Maintenance Wing, Sarak Bhaban, Ramna, Dhaka.
Start Date: 06 July 2008. Completion Date: 31, December 2009
Nature of Works

DBS Wearing Course (Plant Method): 1,063.95m3 DBS Wearing Course (50mm thick- Avg.) : 9,473.889 m3 Bituminous Tack Coat: 1,98,044.251 sqm. Earth Shoulder: 10,301.25 m3 Road Marking: 2,720.00 sqm.



Total Contract Price:BDT - 9.65 Crore I US$ - 1.38 Million

Toll Collection, Operation and Maintenance (T, 0 & M) works of the Hatikamrul-Bonpara New Road and associated works under Roads & Highways Department.

Employer: Executive Engineer, RHD, Road Division, Natore.
Start Date: 10th May 2003,
Completion Date: 9th May 2008
Nature of Works

Collection & Control of Toll revenue and banking of toll revenue. Safekeeping, handling, transporting & reconciliation Control of traffic through the Toll Plaza area. Toll reporting & administration. Independent toll audit system management. General maintenance of bridge, culvert, side/ cross road, traffic road, landscaping, river training, emergency equipment, safety precaution for road accident, road traffic management, response the traffic accident promptly and clear the road for traffic movement etc.



Total Contract Price:BDT - 12.48 Crore I US$ - 1.77 Million

PMP/2005-2006/04, OBST & Overlay Works

(i)Mymensingh-Raghurampur-Netrokona-Mohongonj-Sunamgonj (Ch: 6+800-21+800)
(ii) Mymensingh-Raghurampur-Netrokona-Mohongonj-Sunamgonj Road (Ch: 21+800-40+950).
Employer: Employer's Representative, PMP 2005-2006 & Additional Chief Engineer (RHD), Planning and Maintenance Wing, Sarak Bhaban, Ramna, Dhaka.
Start Date: December, 2004
Completion Date: December, 2005
Nature of Works

Earth Work, Sub Base, Base Course, Asphalt Pavement & Road Marking.



Total Contract Price:BDT. 10.23 Crore | US$ : 1.64 Million

Construction of 180.125m Bridges at Betka Bazar on Betka-Teghoria Road at Upazila on Isamati Delleswari River in Munshigonj.

Employer: Executive Engineer, Local Government Engineering Department, Munshigonj.
Start Date: August, 2004
Completion Date: August 2005
Nature of Works

Earth work, execution of In situ piles, Pile Load test, rebar, R.C.0 casting, staging, form work, expansion joint, pier, abutment, deck slab, approach road, protective works etc.



Total Contract Price:BDT - 3.99 Crore I US$ - 0.64 Million

PMP-2004-2005/15 (Joydebpur-Mawna-Mymensingh Road)

Employer: Executive Engineer, RHD, Road Division, Mymensingh.
Start Date: Dec. 2004
Completion Date: July 2005
Nature of Works

Aggregate Base Type-I : 3,102.7750 cum.
Bitumenous Prime Coat (Plant Placed): 19,913.500 sqm.
Bituminous Tack Coat: (Plant work): 2,04,992.250 sqm.
Dense Bitumenous Surfacing Wearing Course: (Plant Method): 11,377.5230 cum.



Total Contract Price:BDT -12.45 Crore I US$ : 1.75 Million

PMP 2003-2004/02

(i) Muktisharoni (Folder Road) (ii) Dhaka-Narayangonj Link Road
Employer: Additional Chief Engineer (RHD), Planning and Maintenance Wing, and Superintending Office, PMP-2003-04, Sarak Bhaban, Ramna, Dhaka.
Start Date: 31.01.2004
Completion Date: 21 December, 2004
Nature of Works

Embankment Fill from Borrow Pit in contractors Acquired Land: 19,431.71 cum.
Construction of Hard Shoulder: 300.00 cum.
Scarify, Mix and Recompact Existing Pavement and Shoulder: 1,200.00 sqm.
Repair of Pothole on the Existing Pavement: 152.5099 cum.
Bituminous Tack Coat : 286,251.10 sqm.
Dense Bituminous Surfacing Base Course: 3,459.21 cum.
Dense Bituminous Surfacing Wearing Course: 10,767.5525 cum.
Road Marking-Thermoplastic Material: 4,663.63 sqm.



Total Contract Price: BDT - 12.00 Crore I US$ - 1.94 Million

RRMP-III, Contract No. 2A (Dhaka -Sylhet Road, Mirpur to Aushkandi Junction), Roads & Highways Department.

Employer: Project Director, RHD & Addl. Cheif Engineer, RRMP- Ill, Sarak Bhaban, Dhaka.
Start Date: 02.07.2001
Completion Date: December, 2004
Nature of Works

Construction of Road of 34 km Earth work: 15,39,568.00 cum
Sub-base: 2,29,830.00 cum
Base Course: 80,866.00 cum
Asphalt Concrete: 43,660 Ton
Bridge & Culvert concrete works (with 25,020.73 cum. concrete): DBST 1,09,347.00 sqm.



Total Contract Price:BDT - 162.00 Crore I US$ - 26.13 Million

RRMP-III, Contract No. 1 A (Dhaka -Sylhet Road, Kantchpur to Narshingdi Junction), under Roads & Highways Department.

Employer: Project Director, RHD & Addl. Cheif Engineer, RRMP- Ill, Sarak Bhaban, Dhaka.
Start Date: 12.10.2000
Completion Date: June, 2004
Nature of Works

Construction of Road of 32 km Earth work: 17,62,181.00 cum
Subbase: 2,53,170.00 cum
Base Course: 76,765.00 cum
Asphalt Concrete: 48,662.00 Ton
Bridge & Culvert Concrete works ( with 65,950.00 cum. Concrete ) DBST 98,326.00 sqm.



Total Contract Price:BDT - 133.90 Crore I US$ - 21.60 Million

PMP-2002/07 (Sylhet-Sunamgonj Road), under Roads & Highways Department.

Employer: Executive Engineer, RHD, Sylhet Road Division, Sylhet.
Start Date: January, 2003
Completion Date: January, 2004
Nature of Works

Earth work: 2,22,800.00 cum DBST : 2,20,113.00 sqm. Road Marking: 1,463.00 sqm. Road Signs: 39 Nos. Sign Post: 78 Nos.



Total Contract Price:BDT - 8.01 Crore I US$ - 1.31 Million

PMP 2001/09 (Zia Airport to Tongi Road), Roads & Highways Department.

Employer: Executive Engineer, RHD, Road Division, Dhaka & Project Manager PMP 2001/09.
Start Date: 14th June 2001
Completion Date: 30th June 2002
Nature of Works

DBS Base Course, DBS Wearing Course, Road Marking, reflecting road studs, road sign.



Total Contract Price:BDT - 5.64 Crore I USS - 0.94 Million

MTBRP/R/2002/01 (Mymensingh Town Bypass Road), under Roads & Highways Department.

Employer: Superintending Engineer, RHD, Road Circle, Mymensingh Road Circle, Mymensingh.
Start Date: December, 2002
Completion Date: June, 2003
Nature of Works

Earth Work, Sub Base, Base Course, Asphalt Pavement & Road Marking.



Total Contract Price:BDT - 4.31 Crore I US$ - 0.72 Million

MTBRP/R/2002/02 (Mymensingh Town Bypass Road), under Roads & Highways Department

Employer: Superintending Engineer, RHD, Road Circle, Mymensingh Road Circle, Mymensingh.
Start Date: December, 2002
Completion Date: June, 2003
Nature of Works

Earth Work, Sub Base, Base Course, Asphalt Pavement & Road Marking.



Total Contract Price:BDT - 4.25 Crore I USS - 0.71 Million